Skip to content
Sumetrio

Gravel calculator

Aggregate is sold by volume in some markets and by weight in others, so the result comes both ways. Weight needs a bulk density, which depends on the stone and its moisture — enter your supplier's figure rather than a generic one.

The finished layer thickness after compaction.

Covers settling, compaction and uneven ground.

Optional. Ask your supplier — dry gravel is commonly around 1.4 to 1.7 t/m³, but it depends on the stone, the grading and how wet it is. Leave blank for volume only.

Result

Volume with allowance
1.155 m³
Volume
1.05 m³
In cubic yards
1.511 yd³
Area
21 m²

How this is calculated

volume = area × depth
ordered = volume × (1 + allowance ÷ 100)
weight = ordered volume × bulk density

Volume is straightforward. Weight is not, because it depends entirely on the bulk density of the specific material, and that is a property of what your supplier is actually delivering rather than of "gravel" in general.

depth
— the thickness of the finished layer
bulk density
— mass per unit volume of the loose material, including the air between stones
allowance
— the extra you add for settling and uneven ground

Worked example

A path 6 m long and 3.5 m wide, laid 50 mm deep, needs 6 × 3.5 × 0.05 = 1.05 m³. With a 10% allowance that is 1.155 m³, or 1.51 cubic yards. If your supplier quotes a bulk density of 1.55 t/m³, that comes to 1.79 tonnes — so you would order two tonnes and have a little spare for topping up where it settles.

How to use it

  1. Enter the area as length and width, or directly if you have measured an irregular shape.
  2. Set the depth of the finished layer. A decorative path is usually shallower than a driveway that carries vehicles.
  3. Add an allowance for settling and for ground that is not perfectly level.
  4. Enter a bulk density only if you want a weight, and only a figure your supplier gave you.

Limitations and assumptions

  • Bulk density varies with the stone type, the particle grading and the moisture content. Wet aggregate is heavier than dry. The tool takes your figure rather than inventing one, because a generic default would be wrong often enough to matter when you are ordering by the tonne.
  • This models a rectangular area at a uniform depth. Curved paths, slopes and areas that vary in depth should be split into parts and added.
  • Compaction reduces volume. A layer laid loose and then rolled settles noticeably, which is what the allowance is for — but the right allowance depends on the material and the compaction method.
  • Sub-base, membrane, edging and the excavation itself are not included.
  • The short ton (2000 lb) and the tonne (1000 kg) are different units and both are shown, because mixing them up is a 10% error.

Questions

How much gravel do I need for my driveway?

Multiply the area by the depth. A 20 m² driveway at 50 mm deep needs 1 m³. The depth matters more than people expect: going from 50 mm to 75 mm adds half as much again to the order.

How many tonnes is a cubic metre of gravel?

It depends on the material, which is why this tool asks rather than assumes. Dry gravel is commonly in the region of 1.4 to 1.7 tonnes per cubic metre, but grading and moisture move it, and your supplier can tell you the figure for what they are actually sending.

Should I order by volume or by weight?

Order in whatever unit your supplier quotes, and use this tool to translate. Ordering a volume and receiving a weight calculated at a different density than you assumed is how people end up short.

How deep should the layer be?

That is a specification question, not an arithmetic one, and it depends on the traffic the surface will carry and on the sub-base beneath it. This tool will not recommend a depth — ask your supplier or a groundworker.

Related calculators

This page has not yet had an editorial review.